type: Civic Update
title: New sidewalk planned on Turk Hill Road
update_kind: project
stage: approved
stage_date: '2026-09-09'
next_milestone: Construction bids; construction expected in 2027
plain_language: >-
  The Town Board has funded new and replaced sidewalk on Turk Hill Road toward
  the Community Center and authorized construction bids. Construction is
  expected in 2027; nothing is built yet.
official_url: >-
  https://perinton.gov/news/town-supervisor-jenn-townsend-announces-new-sidewalk-extension-and-replacement-project-along-turk-hill-road/
checked_on: '2026-10-03'
tags:
  - sidewalks
  - walking
  - project
  - living-here
sources:
  - resource: >-
      https://perinton.gov/news/town-supervisor-jenn-townsend-announces-new-sidewalk-extension-and-replacement-project-along-turk-hill-road/
    title: >-
      Town of Perinton: Turk Hill Road sidewalk extension and replacement
      project announcement (April 23, 2026)
  - resource: >-
      https://perinton.gov/file/464/2026/22651/2026-09-09-town-board-meeting-minutes
    title: 'Town of Perinton: Town Board meeting minutes, September 9, 2026'
generated:
  by: 'process:hm-schema-v2-p3'
  at: '2026-10-04T18:49:45.826Z'
decision_body: Perinton Town Board
outcome: >-
  September 9, 2026: the Town Board created the $1.3 million capital project and
  authorized construction bids, 5-0. The $887,190 transfer from the Sidewalk
  Reserve is subject to a 30-day permissive referendum.
outcome_url: 'https://perinton.gov/file/464/2026/22651/2026-09-09-town-board-meeting-minutes'
superbee_updated_by: 'process:hm-schema-v2-p3'
---
# New sidewalk planned on Turk Hill Road

Turk Hill Road is getting about 4,600 feet of new and replaced sidewalk, from Summit Street in the village to the Perinton Community Center and Town Hall, with construction expected in 2027. The Town Board funded the project and authorized construction bids on September 9, 2026; nothing has been built yet.

The plan includes a pedestrian bridge over a tributary to Thomas Creek. The $1,300,000 budget (Capital Project 44) combines $307,000 in committed Monroe County sidewalk funding, $105,810 already set aside for engineering and $887,190 from the town's Sidewalk Reserve. The Sidewalk Reserve transfer is subject to a 30-day permissive referendum. Bid results and construction dates haven't been posted.